Kharadi Metro Extension: Pune's IT Corridor Gets Rail-Ready

Two metro corridors are converging on Kharadi, promising faster commutes by the decade's end.

Enquire Now

Pune Metro's Kharadi Extension: What Homebuyers Need to Know

Kharadi, Pune's sprawling IT and business district, is about to get double the metro connectivity. Two separate corridors under Pune Metro Phase-2 are now heading toward this eastern suburb, a rare instance of a single locality being targeted by two rail lines at once. The Union Cabinet has cleared both projects, and the Maharashtra government has followed up with its own administrative approvals, moving the plans from paper to pre-construction.

The first corridor, Line 2B, extends the existing Aqua Line from Ramwadi to Wagholi and Vitthalwadi. The Union Cabinet approved the Pune Metro Rail Project Phase-2, with two elevated corridors spanning 12.75 km and 13 stations, connecting fast-developing suburbs such as Chandani Chowk, Bavdhan, Kothrud, Kharadi, and Wagholi. The project is scheduled for completion within four years, with an estimated cost of Rs 3,626.24 crore, to be equally shared by the Government of India, Government of Maharashtra, and external bilateral/multilateral agencies. On the ground, this corridor runs through Viman Nagar and Kharadi Bypass before terminating near Wagholi, and travel time is expected to drop to 22 minutes from Ramwadi to Wagholi, saving up to 38 minutes over road trips.

The second, larger corridor is Line 4, connecting Kharadi directly to Khadakwasla via Hadapsar and Swargate. The Union Cabinet has approved Line 4 (Kharadi–Hadapsar–Swargate–Khadakwasla) and Line 4A (Nal Stop–Warje–Manik Baug) under Phase-2, together spanning 31.636 km with 28 elevated stations connecting IT hubs, commercial zones, educational institutions, and residential clusters across East, South, and West Pune. The project will be completed within five years at an estimated cost of Rs 9,857.85 crore, jointly funded by the Government of India, Government of Maharashtra, and external bilateral/multilateral funding agencies. In February 2026, the state government formalised its share of this funding. The Maharashtra government granted revised administrative approval for the Kharadi–Swargate–Khadakwasla line and the Nal Stop–Warje route, with the combined 31.6 km project estimated at Rs 9,857.85 crore, with the Union and state governments each contributing Rs 1,212 crore, and the remainder met through loans and other sources.

Both lines will meet Kharadi commuters at a common point. These lines will seamlessly integrate with operational and sanctioned corridors at Kharadi Bypass & Nal Stop (Line 2), and Swargate (Line 1). That interchange effectively turns Kharadi into a junction node on Pune's metro map rather than a spur-end suburb, a status upgrade that matters for daily commuters and property values alike.

On the construction front, Line 2B is moving faster since it's technically an extension of an already-operational line. Tenders for Ramwadi–Wagholi construction started in late 2025, with bids opening around January 2026, and work is set to begin in Q1 2026, split into a 4.8 km phase and a 6.8 km phase. Industry trackers are cautious on the full timeline though: full completion is targeted for 2029-2030 for the Ramwadi–Wagholi extension, with the 4-5 year build following tender awards and land acquisition. Line 4, being a larger greenfield stretch, is a touch behind. Pre-construction activities such as topographical surveys and detailed design consultancy are already underway.

The ridership numbers explain why the government is prioritising this corridor. Daily ridership on Line 4 and 4A combined is expected to be 4.09 lakh in 2028, rising to nearly 7 lakh in 2038, with the Kharadi–Khadakwasla corridor alone accounting for 3.23 lakh passengers in 2028, growing to 9.33 lakh by 2058. On the Line 2B side, the projected incremental daily ridership for the entire Line 2 is estimated at 0.96 lakh in 2027, rising to 2.01 lakh in 2037 and 2.87 lakh in 2047. A local property analysis puts the shift in plain terms for residents: once Line 4 opens, this becomes a direct ride with no interchange at all, which is a genuine preview of how much simpler Kharadi's connectivity gets once construction wraps up.

For homebuyers and investors tracking Kharadi, the takeaway is straightforward: this is not a single metro line but a two-pronged rail push into one of Pune's busiest IT catchments, home to EON Free Zone, World Trade Center, and dozens of business parks. Kharadi is a suburb located in the Eastern Metropolitan Corridor of Pune on the banks of the Mula-Mutha river that serves as a hub for information technology and business parks, and is rapidly developing in terms of residential and office projects. With two metro lines converging here and construction tenders already rolling out, the next 3-4 years will be a key window for anyone evaluating an early entry into Kharadi and its adjoining micro-markets like Manjri, Hadapsar Annexe, and Wagholi.

Project

BIRLA Projects

Birla Estates Bund Garden
Upcoming

Birla Estates Bund Garden

Bund Garden, Pune

1, 2, 3 BHK • Price on Request

Upcoming premium homes in central Pune

Birla Estates Mharal-Varap, Kalyan
Upcoming

Birla Estates Mharal-Varap, Kalyan

Varap, Kalyan

1, 2, 3 BHK • Price on request

Upcoming Birla Estates address on Murbad Road

BIRLA NAVYA HINJAWADI
Upcoming

BIRLA NAVYA HINJAWADI

Hinjawadi, Pune

2, 3 BHK (proposed) • Price on request

Planned by Birla Estates for Pune's IT corridor

Birla Sector 150 Noida
Upcoming

Birla Sector 150 Noida

Sector 150, Noida

2, 3, 4 BHK • Price on Request

131-acre township with golf course & stadium

Birla Alandi
Pre-Launch

Birla Alandi

Alandi, Pune

2, 3 BHK • Price on Request

18-acre township, 75% open space

BIRLA CENTURY HILLS
Pre-Launch

BIRLA CENTURY HILLS

Worli, Mumbai

2, 3, 4, 5, 6 BHK • Rs 4.50 Cr onwards*

15-acre Century Mills address

Birla Chattarpur
Pre-Launch

Birla Chattarpur

Chattarpur, South Delhi

2, 3 BHK • Price on Request

Bright, airy homes in South Delhi's green enclave

BIRLA COMMERCIAL SHETTIGERE DODDAJALA
Pre-Launch

BIRLA COMMERCIAL SHETTIGERE DODDAJALA

Shettigere, Doddajala, Bangalore

Retail, Office, Studio Apartments • Price on Request

High-street retail & office hub near KIAL

Get In Touch

Fill in your details and we will reach out to you.

Back

FAQs

Which metro lines are being extended to Kharadi?
Two corridors are planned: Line 2B, extending the existing Aqua Line from Ramwadi to Wagholi/Vitthalwadi via Kharadi Bypass, and Line 4, a new line running from Kharadi to Khadakwasla via Hadapsar and Swargate.
When was the Kharadi metro extension approved?
The Union Cabinet approved Line 2A/2B in June 2025 and Line 4/4A in a subsequent decision, with the Maharashtra government issuing its own revised administrative approval for Line 4 in February 2026.
How long is the Ramwadi-Wagholi (Line 2B) stretch?
This corridor spans 11.63 km with 11 stations, passing through Viman Nagar, Kharadi Bypass, and Wagholi before ending near Vitthalwadi.
When will the Kharadi metro extension be completed?
Line 2B is targeted for completion within four years of approval, roughly 2029-2030, while Line 4 has a five-year completion window. Construction tenders for Line 2B began rolling out in late 2025 and early 2026.
What is the total cost of these metro projects?
Line 2A and 2B together cost around Rs 3,626 crore, while Line 4 and its Nal Stop-Warje spur are estimated at Rs 9,857.85 crore, jointly funded by the central government, state government, and multilateral agencies.
Will Kharadi have an interchange station?
Yes. Kharadi Bypass is planned as an interchange point where Line 2 (Aqua Line extension) and Line 4 will connect, giving residents access to both the east-west and north-south metro network without long detours.
How will the metro extension affect property prices in Kharadi?
Improved last-mile connectivity typically drives sustained appreciation and rental demand in IT-heavy micro-markets. Kharadi and adjoining corridors like Manjri and Hadapsar Annexe are already seeing developer activity ahead of the metro's arrival.
Is construction currently underway for the Kharadi metro lines?
Pre-construction work such as topographical surveys and detailed design consultancy has started for both lines, and construction tenders for the Ramwadi-Wagholi stretch began in late 2025 with work expected to start in 2026.
Which areas will benefit most from the Kharadi metro extension?
Kharadi, Wagholi, Viman Nagar, Hadapsar, Magarpatta, and Swargate are among the key beneficiaries, as the two lines together connect IT parks, commercial zones, and residential clusters across east and south Pune.
Are there Birla Estates projects near the Kharadi metro corridor?
Yes, Birla Estates has an under-construction township, Birla Evam, in nearby Manjri with connectivity to Kharadi, Hadapsar, and Magarpatta, along with its Sangamwadi project Birla Punya in central Pune.

Shared for informational purposes only; nothing here is an offer or a contract. Plans, prices, and visuals are representative and may be updated at any time. Verify independently before you commit. About · Projects